sanitary napkin making line
1.Speeds:450-500 piece of /minutes
2.Specification:M:455mm*220mm
3.Qualified rate above 98%
Port: XIAMEN
Minimum Order Quantity: 1 Set/Sets
Supply Ability: 1 Set/Sets per Month
Payment Terms: T/T
Contact SupplierPackaging Detail: 1.Parting cutting trip: 2 set2.Attachment tools: 1 set3.Electro thermal pipe: 5 pieces4.Thermoelectric couple: 1 piece5.Cutting blade: 1 set6.Synchronous belt: 5 pieces7.Operating instruction: 1 piece8.Elementary diagram: 1 piece
Delivery Detail: 120-135 Days after down payment received
sanitary napkin making line
Main Parameter:
1.Product dimension:Depends on the products requirement
2.Design speed:500 pcs / minute
3.Production speed:400 pcs / minute(medium size)
4.Power:380V 50HZ
5.Equipment power:about 100KW(exclude glue machine,air presser)(FYI)
6.Product percent of pass: ≥ 98%(exclude glue machine,raw material and the scrap
that produced in material changing)
sanitary napkin making line
MACHINE CAPABILITY CONFIGURATION
1.Smashing systems (smashing raw sewage think liquid)
2.Wooden oars feeds,the high polymer broadcast sowing installment use the independent
frequency conversion control.
3.Elastic waist,front the waist pastes,about the waist pastes provides
4.Main materials use the permanent tension control drive shaft core to actuate to put the
volume,the production process automatic control,the engine off does not trade the volume,
the compoundingingredient automatic detection equipment automatically rejects is not good
5. Main materials use the air operated inflation input axis and automatically correct an error to install
6.Front waists paste may use take shape the material or in machine on plastic (pattern may
decide rank to cut)
7.Bottoms membranes on-line compound take shape by the PE membrane and the adhesive-
bonded cloth
8.Entire machine PLC automatic control and entire machine actuation frequency conversion control
9.Control desks touch the screen control,touches the screen to operate the terminal to provide the
manmachine dialogue contact surface,the realization graph digitization holds controls (each kind
of parameter hypothesis,production speed,class output and breakdown demonstration)
10.May provide according to the customer request piles up the code machine
main spare parts suppliers:
NAME | BRAND | ORIGINAL LOCATON |
PROGRAMMABLE CONTROLLER(PLC) | MITUSBISHI | JAPAN |
TOUCH SCREEN(10.4inch) | MITSUBISHI | JAPAN |
Servo decoiling(7 sets) | MITSUBISHI | JAPAN |
MAIN CONVERTER | DANFORTH | DENMARK |
AUTOMATIC TECTING DEVICE(9PCS) | CHINA | |
TEMPERATURE CONTROLLER | AZBIL | JAPAN |
BEARING (MAIN TRANSMISSION AXLE. KNIVES) | NSK | JAPAN |
SYNCHRONOUS BELT | GATES | AMERICNA |
FLAT BELTE | HABASIT | SWITZ |
CYLINDER/SOLENOID PILOT ACTUATED VALVE | AIRTIC | TAIWAN |
Equipment testing:
1.During testing, the testing material is at buyer’s charge when testing in seller’s site.
While testing material is at buyer’s charge after machine arrived in buyer’s site. If material
quality or gluing machine cased the machine do not pass the acceptance checks should be
solved by negotiation of both parties.
2.The matched gluing machine (seller provide the factory) is at buyer’s charge and send to
buyer’s site to test one month before testing. In details should be cooperated both by
manufacturer and glue machine supplier.
3.Inspection depends: According to the product drawing which was agreed by both parties
and national standard and “products presentation quality inspecting requirement” to inspect:
4.The examine content to the equipment and characteristic of the production line and quality
conformance in inspection and acceptance
4.1. Test in seller’s site before delivery: according to the equipment (medium size) will
continuous work in one hour in nominal speed (300 pieces/ minute), the products QTY should
be 15300 pieces. Machine opening rate is more than 85~90% and product percent of pass
more than 97%.
4.2. Test in buyer’s site after delivery: according to the equipment (medium size) will
continuous work in two hours in nominal speed (300 pieces/ minute), the products
QTY should be 30600 pieces. Machine opening rate is more than 85~90% and
product percent of pass more than 97%
delivery date:120 days after receiving the down payment.
inspection before loading:buyer send people to seller’s site to inspect.