Packing Machine Sellers
Pack speed:40-60bag/min
Measure range:5-100ml
Material:304SS
Controlled by computer and step motor
Port: shanghai
Minimum Order Quantity: 1 Set/Sets 1 set
Supply Ability: 500 Set/Sets per Month 100 week
Payment Terms: T/T
Contact SupplierPackaging Detail: wooden case
Delivery Detail: 10 days after receiving prepayment
DXDK300 Packing Machine with four side sealing
Discription:
1.Can finish the function of bag making, measuring,filling,sealing,cutting and counting.
2.Controlled by computer and step motor pull bag, flexible bag length cutting, operator
needn't to adjust the unloading working, saving time and saving films.
3.Separate PID control to temperature, suitable for various packing materials.
4. Option device: ribbon printer, filling device, gas-exhaust device, horizontal sealing punching device, rotary cutter, small cutter, former beat device,
batch pneumatic cutter.
5.Simple driven system, working more stable and easy to maintain.
6. Packing material:(PET/PE), (Paper/PE), (PET/AL/PE), (OPP/PE)
Feature
LCD screen, intelligent control, failure warning, Solid intelligence double road temperature control,
The design of circulatory wind-electric cabinet for 24 hours working, 304 stainless steel
Specification:
Model No. | DXDK-300 |
Packing speed | 20-40bag/min 30-50bag/min 40-60bag/min |
Range of measurement | 5-330ml (5-80ml Six cups on double trays) 50-330ml(Four cups on double trays) 0-5ml (fixed cup on single tray) |
Bag size | W: 30-120mm L:30-170mm Can be lengthened accordingly |
Voltage | 380V or 220V or made accordingly |
Power | 1600W |
Dimension | 930*730*1700mm |
Packing material | (PET/PE), (Paper/PE), (PET/AL/PE), (OPP/PE) |
Method of Measurement | Cup type |
Weight | 250kg |
After Sales Service:
1.Guaranty: One Year.
2.One set of consumable accessories will be provided with the machine.
3.Any question, you can mail/call us at any time. And our most experienced engineers are assigned to give consulting service, and always available for dispatching abroad.
4.All spare parts are always available for delivery.
5.Manual is in English.
Installation/ Training
If really dont know how to install and operate after showing the video and telephone instruction, you can ask for installation from us. It must be after shipment till the machine has arrived and factory must be ready equipped with all necessary requirements before booking installation. Our engineers will come to the site for the complete and final installation. During the installation session, a one-day training course will be provided to our customers about operation and maintenance procedure. The following costs should be paid by the buyer, including engineer's all local transportation, accommodation, and air tickets (round trip).
Application
Welcome to our factory !