1.high speed multi cylinder line mesh packing paper machine
2.new modern paper making machine
3.paper production line
Port: Qingdao Or Tianjin Port
Minimum Order Quantity: 1 Set/Sets
Supply Ability: 10 Set/Sets per Month
Payment Terms: T/T,Western Union,negotiation
Contact SupplierPackaging Detail: 1.Pack the machine into wooden carton2.Some epuipment part is nuded cargo3.Packed as customer's requirement4.Regular package as seller's option
Delivery Detail: 30--50 days
high speed multi cylinder line mesh packing paper machine
overview
According to the user's basic requirement and general requirement on products quality and production capacity, we have determined the paper making equipment and process by means of design calculation on the base of similar paper machine operating experience. This paper machine mainly used to produce cultural paper,office printing paper,writing paper and students' paper etc. We make an detailed description on technical data, basic structures configuration, supply scope and installation etc. The process information is only for you reference, subject to final order to design.
technical parameter:
1.output paper: toilet paper,tissue paper,packing paper,office paper,cultural paper
2.output grams: 14--200g/m2
3.output capacity: 1--50T/D
4.driver style: frequency control and sub step transmission
5.the model:square box machine and have left or right hand machine
A.Lead time:30--90 days
B.Term of payment:T/T,30% in advance,70% before shipment
After Sale Service:
1,The company strictly in accordance with the signed device configuration and technical requirements, according to the national industry standard for design and manufacturing, and guaranteed to the user's device is compliant qualified products.
2,After the commencement of the contract, within ten days of the equipment design and manufacturing company, End-user installation process coordination, convergence,and inspection;business contacts on both side of the letter have to be back within 8 hours.
3,In accordance with the mutually agreed time and the cycle for equipment installation, and commissioning.
4,Equipment quality and shelf life of one year,the vulnerability is not within the guarantee period. Package of quality roller shelf life of six months. Refers to all goods shipped to the user. The date of acceptance for the quality of shelf life.
5,The quality warranty period, the company free of charge to provide the necessary technical services. Occurred as a result of equipment design, manufacturing quality problems lead to equipment, the company will responsible for replacement and maintenance.
6,After shelf life, the company provide customers with technical services for life, and long-term to price and quick delivery of spare parts.
7,The company responsible for all production technologies an installation, conferred to production workers, ensure that the church workers to operate.
Installation Projects:
Pulping equipment installation OK
Installation of paper machine equipment OK
Common components configuration OK
Department based the installation of transmission OK
Static and Dynamic balance correction OK
Pipeline installation OK
The adjustment of entire production line and try to run OK