LuHuan can coat rebar and steel pipe to meet a variety of specifications and can offer a full line of FBE Application equipment.
Port: ShangHai
Minimum Order Quantity: 1 Set/Sets
Supply Ability: 20 Set/Sets per Year
Payment Terms: L/C,T/T
Contact SupplierPackaging Detail: By bundles or as per customers' requirement
Delivery Detail: According to production arrangement and customers' requirement
LuHuan can coat rebars and steel pipe to meet a variety of specifications.
LuHuan can also offers a full line of Fusion Bond Epoxy Application Equipment including shot blasting machine,electro static spray systems,dust collectors,vacuum loading systems, powder shrouds, fire suppression equipment, shaker separators,&bsp; furnaces, air dryers, and cooling towers.
HEATED TAPE MATERIAL SPOOL OFF SYSTEM
The Tape Material Spool Off System eliminates heated storage of tape, improves bonding, improves pliability and irons out the wrinkles.
The system offers uniform heating of the tape with it’s electrically controlled heating element. The output temperature is checked and adjusted electrically with its thermostat controls mounted inside the roller drum.
The system includes a quick changeover process for “latch on the fly” continuous operation. The flip over system loads material with rotating arms eliminating material lifting.
The tension system is operated by engaging a controlled hydraulic system provided and mounted to the main drive drum. This tension system provides tape tension adjustment from 0 to 3,000 pounds.
Manufacturing Process
The application of fusion-bonded epoxy coating to steel reinforcement involves
four major process steps:
1. surface preparation
2. heating
3. powder application and
4. cure.
In most North American coating plants, reinforcing bar is first coated in straight lengths and then fabricated (i.e., cut to length and bent to shape). A few facilities have the capabilities to coat reinforcing steel (both bars and welded wire fabric) after it has been fabricated. Regardless of the facility’s configuration, the four basic steps of application are required.
1. Surface Preparation
Reinforcing bars are blast-cleaned to a near white metal finish using abrasive grit. This cleans the steel of contaminants, mill scale and rust. It also roughens the surface to give it a textured anchor profile. During this process, salt contamination is also removed.
2. Heating
Bars are heated to approximately 450°F, typically using electrical induction heaters, although gas-fired heating is used in some cases.
3. Powder Application
The heated steel is passed through a powder-spray booth where the dry epoxy powder is emitted from a number of spray nozzles. As the powder leaves the spray gun, an electrical charge is imparted to the particles. These electrically charged particles are attracted to the grounded-steel surface providing even coating coverage. When the dry powder hits the hot steel, it melts and flows into the anchor profile (i.e., the microscopic peaks and the valleys on the surface) and conforms to the ribs and deformations of the bar. The heat also initiates a chemical reaction that causes the powder molecules to form complex cross-linked polymers which give the material its beneficial properties.
4. Cure
Following powder application, the coating is allowed to cure for a short period (approximately 30 seconds) during which time it hardens to a solid. In some plants, the curing is often followed by an air or water quench that quickly reduces the bar temperature to facilitate handling.