1.HD-00 welding platform
2.T-beam anti creeping
3.T beam clamping device
4.45m long
5.maximum 10 pieces of workpiece
Port: shanghai
Minimum Order Quantity: 1 Piece/Pieces
Supply Ability: 1 Piece/Pieces per Day
Payment Terms: L/C,T/T
Contact SupplierPackaging Detail: wood carton
Delivery Detail: 60 days
HD-00 welding platform
T beam production line
The platform is 45m long and can be placed with 2 pieces of long workpiece at the same time, the transverse can place 5 pieces of workpiece, and maximum 10 pieces of workpiece at one time. The transverse direction use 5 groups of hydraulic clamping organ and the vertical span which is 3m long adopts 14 groups of clamping desk, the clamping organ fix the assembled T beam on the welding platform and avoids felling down while welding. In addition, there are 7 groups of turning organ inside the welding platform, which prevents the T beam from jumping as clamping device release after welding.