1, 2400mm high speed automatic toilet paper machine
2.Simple operation
3.ISO9001-2000
4.Warranty period 1 year
Port: QingDao port and other main ports in China
Minimum Order Quantity: 1 Set/Sets
Supply Ability: 10 Set/Sets per Month
Payment Terms: T/T
Contact SupplierPackaging Detail: 1. Pack the machine into wooden carton. 2. Some equipment part is nuded cargo 3. Packed as customer's requirement 4. Regular package at seller's option 5. As per expoprted standard
Delivery Detail: 30-50 Days
2400mm high speed automatic toilet paper machine
Technical parameters:
Papermaking varieties: Advanced Wrinkle toilet paper
Papermaking quantitative :13-30g / m²
Net paper width: 2400mm
Cage width: 2800mm
Capacity :8-10T / D
Rail distance: 3200mm
Transmission: AC variable speed control, step by step drive.
Overall dimensions: 13148mm × 7170mm × 4580mm
Raw material: paper
Major equipment structure:
1, Park Network Division: φ1500mm × 2800mm cage 1, φ500mm × 2900mm V roll a rubber hardness of Shore 380 ± 2, pneumatic compression device, equipped with a pressure tank-type network.
Second, the dryer section: φ2500mm × 2800mm dryer 1, φ600mm × 2900mm roller 1, the rubber hardness of Shore 900 ± 2, pneumatic compression device, equipped with two sets of composite aerodynamic blade.
Third, take-up department: φ1000mm × 2800mm roll cylinder 1, φ280mm × 2900mm roller 1, adjustable roll stand 2 sets of rolls of two sets of bars.
4, Transmission and Control Division: use AC variable frequency, step-drive, all-digital closed-loop control system.
Lead time:30--90days
Term of payment:TT, 30% in advance,70% before shipment
Shipment: It will be arranged by seller, the seller will offer sea freight to
the buyer two weeks before shipment and the buyer must pay the sea
freight to seller by T/T within 3 days after receive such offer on condition
they accept it. The seller need to pack all machines well.
Installation Projects
Pulping equipment installation ok
Installation of paper machine equipment ok
Common components configuration ok
Department based the installation of transmission ok
Static and Dynamic Balance correction ok
Pipeline installation ok
The adjustment of entire production line and try to run ok