Coating and Laminating Machine
1.paper alu foil sever layer
2.for beverage pure milk
3.200ml 250ml 1000ml
Port: Shanghai port
Minimum Order Quantity: 1 Set/Sets
Supply Ability: 30 Set/Sets per Year
Payment Terms: L/C,T/T
Contact SupplierPackaging Detail: packing:export standard packingcontainer:3 pcs 40"HqPacking number:11pcs1.unwind system:2 pcs2.laminating untir:2 pcs3.extruder unit:4 pcs4.rewind system :1 ps5.control box and others 2 pcs
Delivery Detail: 2 month after get 35% deposit
Technic parameter of coating and laminating machine
No | Character | Specification |
1 | Screw and barrel | (90-65)x2mm,38CrMoAl with hardness treatment with Nitride |
2 | L/D | 32:1 |
3 | T-die | new type featheredge mould with 5CrNiMoV |
4 | Gear box | high strength hard teeth retarder |
5 | temperature control system | Digital type |
6 | Web request | 50gsm-250gsm |
7 | Coating material | PE,PP |
8 | Thickness of coating | 0.012-0.03mm |
9 | Coating width | 600-1000mm |
10 | Symmetrical degree of coating | ±6% |
11 | Peel off strength | 3-5N/30mm |
12 | max extruding capacity | 220kg/h |
13 | Design machine speed | 0-120m/min |
14 | Unwind (first) | Double working |
15 | Unwind (second) | Simple |
16 | rewind | Double working |
17 | wind and unwind diameter | 600-1200mm |
18 | pneumatic roller | 76m |
19 | Total power | about 410 Kw |
20 | Overall size (L×W×H) | 23800×6800×4330(mm) |
21 | Weight | 33500kgs |
Key parts brand list of coating and laminating machine
No | Part | Brand |
1 | Braker motor | Japan |
2 | Inverter motor | USA |
3 | Inverter | Inovance |
4 | Encoder | Omron |
5 | Air cylinder | Taiwan |
6 | PLC mould | JAPAN |
7 | T-die(Steel material) | Jincheng(German #2738) |
8 | Temperature meter | Omron |
9 | Tension controller | JAPAN |
10 | Human inteface | Taiwan |
11 | Contactor | FRANCE |
12 | Air parts | Kortis (France) |
13 | Lower friction air cylinder | Italy |
Certificate supply:SGS ,Origin certificate
Key parts warrante time of coating and laminating machine:
No | Part | Warrante time |
1 | T-DIE | 12 month |
2 | Silica roller | 3 month |
3 | laminating roller | 12 month |
4 | Screw and barrel | 24 month |
5 | PLC system | 12 month |
6 | inverter | 18 month |