1.operation security
2.high paper quality
3.long life time
Port: tianjin,shanghai,etc
Minimum Order Quantity: 1 Set/Sets
Supply Ability: 60 Set/Sets per Year
Payment Terms: L/C,T/T
Contact SupplierPackaging Detail: 1.pack the machine into wooden carton 2.some equipment is nuded cargo3.packed as customer's requirement4.legular package as seller's option
Delivery Detail: 15-30 days after the down payment
A. Process flows:
The process flows: waste paper → high concentration aquapulper → high frequency vibrating screen → pulp pump → efficient double disc pulp grinder → pulp pump → spiral propeller → pulp pump → centrifugal screen → pulp pump → slag remover → 2200 model paper machine → calendar → winding machine → rewinding machine → marketing
B. Main machine list
Product name | model | quantity | motor(kw) |
high concentration aquapulper | 5m³ | 2 sets | 30 |
high frequency vibrating screen | 2m2 | 2 sets | 3 |
efficient double disc pulp grinder | 380 model | 3 sets | 37 |
Pulp pump | 4-8 inch | 12 sets | 18.5kw one, 5.5kw eight, 7.5kw two, 11kw one |
Slag separator | 606 model | 6 groups | |
centrifugal screen | 1.6m2 | 1 sets | 37 |
propeller | 700 model | 4 sets | 11 |
vacuum pump | 15 model | 2 sets | 15 |
2200 model double-cylinder mould, one big dryer and five-small dryer carton paper machine | 2200 model | 1 set | 75kw, 1.5kw |
calender | 2200 model | 1 set | 15 |
Reeling machine | 2200 model | 1 set | 5.5 |
Rewinding machine | 2200 model | 1 set | 7.5 |
Technical requirements
1.production varieties: test liner paper ect.
2.maxi-width: 2200mm
3.grammage: 100-190g/m2
4.rail distance: 2200mm
5.output: 30t/d
6.working speed: 45-120m/min
7.kind of drive: AC frequency, sectional drive
8.machine design: heavy square box type
C. Remark:
The equipment includes all of the land rails, electrical machines, electrical equipments, back wheels, cardan joint couplings, pulleys, belts, screws, sizing blocks, dowels, bearings, base rings, carpets and wires.
We will send 2 engineers to be responsible for installation commissioning and training workers. You need to pay them $50 per day for each person and provide them food, hotel, air tickets and transportation. The installation period will be 90 days.
The delivery time will be 60 days after deposit in advance.