1.1092 culture paper machine
2.Simple operation
3.ISO9001-2000
4.Warranty period 1 year
5.Energy saving
Port: Qingdao/Tianjin
Minimum Order Quantity: 1 Set/Sets
Supply Ability: 5 Set/Sets per Month
Payment Terms: T/T
Contact SupplierPackaging Detail: 1.Part use of the wooden case straw rope2.Finally,according to the contract requirement
Delivery Detail: 30-60days more or less
1092mm 3TPD writing paper making machine offer details :
Technical parameters:
Raw material :waste paper
Output paper: printing paper,writing paper .
Output weight: 30 ---120gsm
Paper width: 1092mm
Net-cage width: 1450mm
Capacity:3T/D
The gauge:1800mm
Drives: use frequency conversion, and drives by step.
Manpower : 8-10mans/shift(8hours)
Factory area required: 1200-1500m2
Lead time:30--90days
Term of payment:T/T, 30% in advance,70% before shipment
After sale service:
1,The company strictly in accordance with the signed device configuration and
technical requirements ,According to the national industry standard for design
and manufacturing, and guaranteed to the user's device is compliant qualified products.
2, After the commencement of the contract, within ten days of the equipment design
and manufacturing company,Enduser installation process coordination, convergence,
and inspection;Business contacts on both sides of the letter have to be back within 8 hours.
3, In accordance with the mutually agreed time and the cycle for equipment installation,
and commissioning.
4, Equipment quality and shelf life of one year, the vulnerability is not within the guarantee period.
Package of quality roller shelf life of six months.Refers to all goods shipped to the user The date of
acceptance for the quality of shelf life.
5, The quality warranty period, the company free of charge to provide the necessary technical services,
Occurred as a result of equipment design, manufacturing quality problems lead to equipment,
the company will Responsible for replacement and maintenance.
6, After shelf life, the company to provide customers with technical services for life, and long-term To price and quick delivery of spare parts, spare parts.
7, The company responsible for all production technologies and installation, conferred to production workers,
Ensure that the church workers to operate.
Installation Projects
Pulping equipment installation ok
Installation of paper machine equipment ok
Common components configuration ok
Department based the installation of transmission ok
Static and Dynamic Balance correction ok
Pipeline installation ok
The adjustment of entire production line and try to run ok
I. Lead time : With 60-90 days
II.Term of payment : 40%T/T in advance ,60% T/T before shipment .
III. Shipment : It will be arranged by the seller , the seller will offer sea freight to the buyer two weeks before shipment and the buyer must pay the sea freight to seller by T/T within 3 days after receive such offer on condition they accept it. The seller need to pack all machines well.
IV. Installation &after sales service . a) The seller will send 3 engineers to go to the buyer's plant to guide installation work of all supplied machines by the seller. They will also guide test run of the whole plant and sign test run and acceptance agreement after successful test run.